Execution & sequencing
Pour cycles, shuttering rotation, crane time, monsoon planning. A tower is a rhythm — my job is keeping the beat when weather, vendors and drawings all miss theirs.
7-day slab cycle held, 8 floors
Electrical design engineer with 6 years in commercial and hospital MEP projects across Mumbai and Hyderabad. Prepares HT/LT single-line diagrams, short-circuit and relay coordination studies in ETAP, and DG and transformer sizing.
Selected projects from the full register of 28. Completion certificates and client references available for every row.
| Project | Scale | Role | Delivery |
|---|---|---|---|
| Compressed air and motor efficiency drivereplaced 22 standard motors with IE3 units and fixed air leaks, saving roughly 9 percent on plant electricity | |||
| Substation upgradeplanned a weekend shutdown to replace an old VCB panel with zero production loss on Monday |
"On time" means the certified completion date, not the press release. One project in 28 ran late — a 2019 mall, 11 weeks, monsoon flooding plus a contractor default. I list it because you'd find it anyway.
Pour cycles, shuttering rotation, crane time, monsoon planning. A tower is a rhythm — my job is keeping the beat when weather, vendors and drawings all miss theirs.
7-day slab cycle held, 8 floors
Cube registers, rebar inspections, pour cards, NCR closure. Concrete doesn't accept apologies — it accepts cover blocks, vibration and curing, checked every time.
0 structural NCRs in 12 years
Height work permits, toolbox talks in three languages, and the unpopular decisions — stopping a pour at 4 p.m. because the shoring didn't look right. It wasn't.
4.2M man-hours, 0 fatalities
RA bills, BOQ deviations, extra-item claims, subcontractor reconciliation. The technical half wins the site; this half keeps the project solvent.
₹34 Cr claims settled, documented
Baseline programmes, look-ahead schedules, catch-up plans that crews actually follow — because they were built with the foremen, not emailed to them.
26 of 28 projects on/ahead
Weekly reviews, design-query turnaround, the honest flag raised early. Clients renew with engineers whose bad news arrives before it becomes expensive.
3 clients, repeat projects
replaced 22 standard motors with IE3 units and fixed air leaks, saving roughly 9 percent on plant electricity
planned a weekend shutdown to replace an old VCB panel with zero production loss on Monday
Photograph — helmet on, drawings in hand, on the slab
Electrical engineer with nine years in plant maintenance and projects for automotive component and process plants. Looks after HT and LT distribution up to 11 kV, DG sets, motors, VFDs and PLC-controlled lines.
"The structure will stand for sixty years. The shortcuts would have been invisible for five."
Experience
Auto component manufacturer supplying passenger car OEMs
Own electrical upkeep of two machining plants with a connected load of 4.5 MW, two 11 kV substations and 18 DG and UPS systems.
Electrical contracting firm for industrial and commercial…
Executed electrical installation for three factory buildings, including transformers, LT panels, cable trays, earthing and lighting.
Process plant for specialty chemicals
Maintained flameproof motors and lighting fittings in hazardous areas, following permit-to-work and gas testing procedures.
Clients & consultants say
Structural consultant
"Saranya is the only site man who calls me before the problem, not after. The stopped pour in 2022 — his call, against every commercial pressure on that site — is why I take his projects."
Principal, structural consultancy, PuneWorked together on 4 projectsClient project head
"His weekly reports say what's actually happening — including what's late and whose fault it is, his own included. After two decades of contractor optimism, that's worth more than any Gantt chart."
VP Projects, developerRepeat client, 3 projectsOpen to senior electrical maintenance engineer and PMC roles — high-rise, industrial or infrastructure. Pune preferred, site postings anywhere in India considered for the right project. Completion certificates and references ready.