Sheet A-00 · CoverElectrical Design EngineerAccepting commissions '26

Drawn for lightbuilt for life.

Electrical engineer with nine years in plant maintenance and projects for automotive component and process plants. Looks after HT and LT distribution up to 11 kV, DG sets, motors, VFDs and PLC-controlled lines.

42■Projects built
09yrIn practice
03▲On site now

What the studio does

Sheet A-02 · Scope of services
Plate 01

Homes, from the plot up

New residences designed around sun paths, monsoon winds and how your family actually moves through a day — from first sketch to the day you get the keys.

Scope: Full design + siteTyp. 14–22 months
Plate 02

Old buildings, new lives

Adaptive reuse and restoration — Portuguese houses, mills, warehouses. Keeping the bones and the memory, replacing everything that leaks, sags or bakes.

Scope: Survey → handoverTyp. 10–18 months
Plate 03

Workplaces that work

Offices, clinics and studios for teams under a hundred — daylight over downlights, cross-ventilation over glass boxes, and acoustics people can think in.

Scope: Design + interiorsTyp. 6–12 months

The studio

Sheet A-03 · General notes

A building should know where it stands — its sun, its rain, its street — before it worries about how it photographs.

Electrical engineer with nine years in plant maintenance and projects for automotive component and process plants. Looks after HT and LT distribution up to 11 kV, DG sets, motors, VFDs and PLC-controlled lines.

Saranya MurugesanAr. Saranya Murugesan · B.Arch, Reg. no. 000000
SM

Portrait — replace with a photograph at the drawing board or on site

Senior Electrical Maintenance Engineer
2025

NDTV Design Award — Residence of the YearCourtyard House, Alibaug

2024

AD India — published, Mill House StudiosAdaptive reuse feature

2022

IIA Goa Chapter — Young Architect Award

From plot to keys

Sheet A-04 · Sequence of work

Listen & measure

Site visit, survey, soil and sun study — and a long conversation about how you live, not what you've pinned.

2–3 weeks

Concept

Two directions, presented as models and plans you can read. We pick one, together, for reasons we can both say out loud.

4–6 weeks

Design development

Materials, structure, services, budget reality-check. The design is frozen before the first brick — changes on paper are cheap.

8–10 weeks

Drawings & permits

Working drawings a contractor can't misread, and the approvals file handled end to end.

6–8 weeks

On site

Fortnightly site visits, a shared photo log, and a snag list we clear before you move in — not after.

Build duration

Curriculum vitae

Sheet A-05 · Record

Practice

5 years · current

Senior Electrical Maintenance Engineer

Auto component manufacturer supplying passenger car OEMs

Own electrical upkeep of two machining plants with a connected load of 4.5 MW, two 11 kV substations and 18 DG and UPS systems.

3 years

Electrical Engineer

Electrical contracting firm for industrial and commercial…

Executed electrical installation for three factory buildings, including transformers, LT panels, cable trays, earthing and lighting.

1 year

Graduate Engineer Trainee

Process plant for specialty chemicals

Maintained flameproof motors and lighting fittings in hazardous areas, following permit-to-work and gas testing procedures.

Education

B.E. in Electrical and Electronics Engineering

Government engineering college affiliated to a state…

First class with distinction

Recognition & publication

NDTV Design & Architecture Award Residence of the Year — Courtyard House2025
Architectural Digest India Mill House Studios, feature2024
FOAID Design Excellence — shortlist Two-Courtyard School2022
IIA Goa — Young Architect Award 2022
Domus India Verandah Clinic, published2023
Guest critic, B.Arch juries Goa College of Architecture2021 —

Registrations

Council of Architecture, India Reg. no. 0000002017
Indian Institute of Architects, Assoc. 2018

Clients, a year in

Sheet A-06 · Post-occupancy

We asked for four bedrooms. He asked why. The answer — grandparents visit twice a year — became a guest wing that closes off entirely. We live in the whole house now, not a quarter of it.

Homeowners, Courtyard HouseAlibaug · moved in 2025

The mill was going to be demolished. Saranya walked in, put his hand on a column, and said "this is the best material on site." Two years later our studio works inside those columns.

Founder, Mill House StudiosPanjim · occupied 2024

Build something
worth keeping.

The studio takes four commissions a year. Tell me about your plot, your building or your idea — I reply personally, usually within two days, and the first conversation costs nothing.

Received — thank you. Expect a personal reply within two working days.

StudioHouse No. 214, Near St. Anthony Chapel
Assagao, Goa 403 507Visits by appointment — Tue & Thu
Phone+00 00000 00000Mon–Sat · 10:00–18:00
ElsewhereInstagram · LinkedIn
ProjectPersonal CV — Ar. Saranya Murugesan
SheetA-08 · Title block
Scale1 : 1 · NTS
Revision© 2026 · Rev. C

Made with Digital CV Maker