Execution & sequencing
Pour cycles, shuttering rotation, crane time, monsoon planning. A tower is a rhythm — my job is keeping the beat when weather, vendors and drawings all miss theirs.
7-day slab cycle held, 8 floors
Site engineer with 5 years in high-rise residential construction across Mumbai and Thane. Manages RCC works for towers up to 30 floors, coordinates shuttering, reinforcement and concreting crews of 60–80 workers, and maintains quality checklists and pour cards.
Selected projects from the full register of 28. Completion certificates and client references available for every row.
| Project | Scale | Role | Delivery |
|---|---|---|---|
| Culvert resequencing planrevised work order that recovered a six-week slippage before the monsoon |
"On time" means the certified completion date, not the press release. One project in 28 ran late — a 2019 mall, 11 weeks, monsoon flooding plus a contractor default. I list it because you'd find it anyway.
Pour cycles, shuttering rotation, crane time, monsoon planning. A tower is a rhythm — my job is keeping the beat when weather, vendors and drawings all miss theirs.
7-day slab cycle held, 8 floors
Cube registers, rebar inspections, pour cards, NCR closure. Concrete doesn't accept apologies — it accepts cover blocks, vibration and curing, checked every time.
0 structural NCRs in 12 years
Height work permits, toolbox talks in three languages, and the unpopular decisions — stopping a pour at 4 p.m. because the shoring didn't look right. It wasn't.
4.2M man-hours, 0 fatalities
RA bills, BOQ deviations, extra-item claims, subcontractor reconciliation. The technical half wins the site; this half keeps the project solvent.
₹34 Cr claims settled, documented
Baseline programmes, look-ahead schedules, catch-up plans that crews actually follow — because they were built with the foremen, not emailed to them.
26 of 28 projects on/ahead
Weekly reviews, design-query turnaround, the honest flag raised early. Clients renew with engineers whose bad news arrives before it becomes expensive.
3 clients, repeat projects
revised work order that recovered a six-week slippage before the monsoon
Photograph — helmet on, drawings in hand, on the slab
Civil engineer with eight years on national highway, flyover and minor bridge projects for EPC contractors. Handles execution planning, subcontractor billing, quality checks and coordination with the authority engineer.
"The structure will stand for sixty years. The shortcuts would have been invisible for five."
Experience
EPC infrastructure contractor
Managed execution of a twenty-two kilometre four-lane highway stretch including two minor bridges and six box culverts.
Urban flyover contractor
Supervised pile foundations, pier construction and precast girder launching for a one-kilometre urban flyover.
Road construction company
Assisted in field density tests, level checks and bituminous layer records on a state highway widening project.
Clients & consultants say
Structural consultant
"Imran is the only site man who calls me before the problem, not after. The stopped pour in 2022 — his call, against every commercial pressure on that site — is why I take his projects."
Principal, structural consultancy, PuneWorked together on 4 projectsClient project head
"His weekly reports say what's actually happening — including what's late and whose fault it is, his own included. After two decades of contractor optimism, that's worth more than any Gantt chart."
VP Projects, developerRepeat client, 3 projectsOpen to project engineer – highways and bridges and PMC roles — high-rise, industrial or infrastructure. Pune preferred, site postings anywhere in India considered for the right project. Completion certificates and references ready.