Homes, from the plot up
New residences designed around sun paths, monsoon winds and how your family actually moves through a day — from first sketch to the day you get the keys.
Civil engineer with eight years on national highway, flyover and minor bridge projects for EPC contractors. Handles execution planning, subcontractor billing, quality checks and coordination with the authority engineer.
Twelve of forty-two. Each project is photographed only after the client has lived or worked in it for a year — buildings should be judged inhabited.
Full portfolio with drawings & site photographs shared on request → write to the studio
New residences designed around sun paths, monsoon winds and how your family actually moves through a day — from first sketch to the day you get the keys.
Adaptive reuse and restoration — Portuguese houses, mills, warehouses. Keeping the bones and the memory, replacing everything that leaks, sags or bakes.
Offices, clinics and studios for teams under a hundred — daylight over downlights, cross-ventilation over glass boxes, and acoustics people can think in.
A building should know where it stands — its sun, its rain, its street — before it worries about how it photographs.
Civil engineer with eight years on national highway, flyover and minor bridge projects for EPC contractors. Handles execution planning, subcontractor billing, quality checks and coordination with the authority engineer.
Portrait — replace with a photograph at the drawing board or on site
NDTV Design Award — Residence of the YearCourtyard House, Alibaug
AD India — published, Mill House StudiosAdaptive reuse feature
IIA Goa Chapter — Young Architect Award
Site visit, survey, soil and sun study — and a long conversation about how you live, not what you've pinned.
2–3 weeksTwo directions, presented as models and plans you can read. We pick one, together, for reasons we can both say out loud.
4–6 weeksMaterials, structure, services, budget reality-check. The design is frozen before the first brick — changes on paper are cheap.
8–10 weeksWorking drawings a contractor can't misread, and the approvals file handled end to end.
6–8 weeksFortnightly site visits, a shared photo log, and a snag list we clear before you move in — not after.
Build durationPractice
EPC infrastructure contractor
Managed execution of a twenty-two kilometre four-lane highway stretch including two minor bridges and six box culverts.
Urban flyover contractor
Supervised pile foundations, pier construction and precast girder launching for a one-kilometre urban flyover.
Road construction company
Assisted in field density tests, level checks and bituminous layer records on a state highway widening project.
Education
Government engineering college
First class with distinction
Recognition & publication
Registrations
We asked for four bedrooms. He asked why. The answer — grandparents visit twice a year — became a guest wing that closes off entirely. We live in the whole house now, not a quarter of it.
Homeowners, Courtyard HouseAlibaug · moved in 2025
The mill was going to be demolished. Imran walked in, put his hand on a column, and said "this is the best material on site." Two years later our studio works inside those columns.
Founder, Mill House StudiosPanjim · occupied 2024
What a 4-foot roof overhang, a shaded west wall and one honest courtyard actually do to indoor temperature — with numbers from our own projects.
Everyone asks. Here is an anonymised budget of a 1920s house restoration — what the laterite cost, what the surprises cost, what we'd do differently.
Twelve questions that tell me more about your future home than a hundred saved images.
The studio takes four commissions a year. Tell me about your plot, your building or your idea — I reply personally, usually within two days, and the first conversation costs nothing.
Made with Digital CV Maker