Execution & sequencing
Pour cycles, shuttering rotation, crane time, monsoon planning. A tower is a rhythm — my job is keeping the beat when weather, vendors and drawings all miss theirs.
7-day slab cycle held, 8 floors
Project architect with seven years in residential and mixed-use developments, leading design development and working drawings for high-rise projects of up to 25 storeys in Pune and Mumbai.
Selected projects from the full register of 28. Completion certificates and client references available for every row.
| Project | Scale | Role | Delivery |
|---|---|---|---|
| University academic block180,000 sq ft teaching building with courtyards and shaded walkways, completed on schedule | |||
| District court complexdesign lead for a public building with separate circulation for judges, visitors and detainees |
"On time" means the certified completion date, not the press release. One project in 28 ran late — a 2019 mall, 11 weeks, monsoon flooding plus a contractor default. I list it because you'd find it anyway.
Pour cycles, shuttering rotation, crane time, monsoon planning. A tower is a rhythm — my job is keeping the beat when weather, vendors and drawings all miss theirs.
7-day slab cycle held, 8 floors
Cube registers, rebar inspections, pour cards, NCR closure. Concrete doesn't accept apologies — it accepts cover blocks, vibration and curing, checked every time.
0 structural NCRs in 12 years
Height work permits, toolbox talks in three languages, and the unpopular decisions — stopping a pour at 4 p.m. because the shoring didn't look right. It wasn't.
4.2M man-hours, 0 fatalities
RA bills, BOQ deviations, extra-item claims, subcontractor reconciliation. The technical half wins the site; this half keeps the project solvent.
₹34 Cr claims settled, documented
Baseline programmes, look-ahead schedules, catch-up plans that crews actually follow — because they were built with the foremen, not emailed to them.
26 of 28 projects on/ahead
Weekly reviews, design-query turnaround, the honest flag raised early. Clients renew with engineers whose bad news arrives before it becomes expensive.
3 clients, repeat projects
180,000 sq ft teaching building with courtyards and shaded walkways, completed on schedule
design lead for a public building with separate circulation for judges, visitors and detainees
Photograph — helmet on, drawings in hand, on the slab
Registered architect with ten years of experience leading institutional and commercial projects from concept design through construction. Coordinates structural, MEP and landscape consultants, manages approvals with local authorities and guides junior teams.
"The structure will stand for sixty years. The shortcuts would have been invisible for five."
Experience
multidisciplinary architecture and planning firm
Leads design and delivery of a 450,000 sq ft university campus, managing a team of eight architects and BIM modellers.
commercial architecture studio
Delivered construction drawings and tender packages for two mid-rise office buildings in the NCR region.
small residential practice
Designed interiors and layouts for 12 private homes, working directly with clients on budget and material choices. Supervised civil contractors on site and checked finishes against approved samples.
Clients & consultants say
Structural consultant
"Rohan is the only site man who calls me before the problem, not after. The stopped pour in 2022 — his call, against every commercial pressure on that site — is why I take his projects."
Principal, structural consultancy, PuneWorked together on 4 projectsClient project head
"His weekly reports say what's actually happening — including what's late and whose fault it is, his own included. After two decades of contractor optimism, that's worth more than any Gantt chart."
VP Projects, developerRepeat client, 3 projectsOpen to senior project architect and PMC roles — high-rise, industrial or infrastructure. Pune preferred, site postings anywhere in India considered for the right project. Completion certificates and references ready.